SKOKIE VALLEY TRAIL

LOCATION: Skokie, IL

A 1.5 mile rails to trails project, the trail will provide a key connection from downtown businesses and surrounding neighborhoods to the Skokie Swift transit station. The project incorporates other sustainable elements including infiltration bioswales, recycled and reused site materials for site furnishings and native prairie plantings. Phase 1 construction completed in spring of 2012.

  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley01.jpg
  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley02.jpg
  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley03.jpg
  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley01.jpg
  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley02.jpg
  • http://altamanu.com/wp-content/uploads/2012/09/skokievalley03.jpg